Eight of us had a very enjoyable day learning the basics of rag rug making with Jenny Barnes. Jenny is a Companion of the Guild of St. George who promotes the craft at home in York and beyond. The Ruskin Studio was full of Jenny's rugs, an array of coloured cloth and our work in progress. We had a lunch of home-made soup, bread and cheese on the lawn in the sunshine, then continued with our creations in the afternoon, all enthusiastically making plans to carry on our new skills at home and at informal gatherings in future.
Sunday, 5 September 2010
Saturday, 29 May 2010
Rob's picture of the Studio
Rob Taylor paints the new Ruskin Studio
Thursday, 15 April 2010
Work starts on the Burlton's Field Barn
Our builder Ron Clowes has now started work on restoring this small field barn on the outskirts of Bewdley.
The work is being made possible through an 80% grant from Natural England through the Uncllys Farm Higher Level Stewardship scheme.
The work will include stripping and relaying the roof tiles on new cleft laths, stabilising the walls and pulling the building back into shape.
It will continue to be used as a field barn for the storage of hay.
Our first training course in the Ruskin Studio
James fitting the solar panels
Here you can see the evacuated tubes of the solar hot water panels being fitted by James after he had completed all the plumbing.
They feed hot water into a large (750 litre) thermal accumulator. Additional sources of heat are the Esse woodburning stove and an electric immersion heater.
The heat from the accumulator is used for the underfloor heating system as well as for hot water for wahing.
Tuesday, 2 February 2010
Kev and Norris laying the floor
- here you can see the floor scree being laid over the underfloor heating pipes. The scree is 70mm thick and will be gently heated by the pipes beneath. They will be drawing hot water from a large (705litre) thermal store which will be heated by the Esse Ironheart stove and by the solar hot water panels on the roof.
As you can see it's a skilled job getting the floor perfectly level and smooth.
Tuesday, 26 January 2010
Underfloor heating goes in
Today James the plumber, with help from Kev and Norris the builders, was busy laying the underfloor heating coils. You can see from the pic that they first put down a 70mm thick slab of insulation, then the pipes are clipped to it before a 70mm scree is floated over the top. The whole thing then forms a thermal store.
In the corner you can see the Esse Lionheart stove installed ready for James to plumb in. Above the stove is a 750litre thermal accumulator that will hold heat overnight and then this will be used to heat the floor the next morning. The solar hot water panels will also feed heat into the store.
Friday, 8 January 2010
Cockerell trying to look smart!
Here he is - a very smart looking chap - a Rhode Island Red - he fluffs up his plummage every morning to show off to the girls and tries to pounce on one or two as they come out of the hen house. Don't think he's had a lot of success yet!
Cattle in the snow
Our Dexters are mostly back at the farm staying in the barn at night and then going out during the day to soak up some rays. Some even seem to prefer to stay outside at night and you can see frost on their backs in the morning - showing just how effective their coats are at keeping them warm.
We have plenty of feed for them but keeping the water flowing is quite a challenge - I usually manage to get it going by about 3pm in the afternoon.
We have plenty of feed for them but keeping the water flowing is quite a challenge - I usually manage to get it going by about 3pm in the afternoon.
Inside the studio
Thursday, 7 January 2010
The new Ruskin Studio - less scaffolding
Looking good once we had taken down the scaffolding and got the PV panels (they generate our electricity) back in place.
With the roof being steeper (50 degrees) and higher we should be able to capture more sunlight.
On the left side of the roof you can see the two manifolds for the solar hot water system - the evacuated tubes will be fitted once all the plumbing is done.